Town of Emmitsburg
300A S. Seton Ave Emmitsburg, Maryland
21727
240-629-6300
|
|
|
Town Manager's
Report
September 2008
Prepared by
David Haller
Streets:
-
Staff
maintained flower hanging pots on the square
-
Staff has
repaired a number of street lights
-
Staff worked
with Gray Construction to replace broken and
misaligned sidewalk on Main Street
-
Staff
installed speed-bumps on Timbermill Run
-
Staff put
up "Fallen Firefighters" banners
Water:
-
Rainbow Lake
is now about 12" below the spillway (up from 19"
below last month)
-
The roughing
filters are now being backwashed twice per day
and the DE filters are being done once per week
-
Copper
Sulfate has been applied to Rainbow Lake.
Beginning this month we will be testing our raw water
monthly for E. Coli for the next year
Water
production and consumption. We produced and
purchased an average of 335,545 gpd. We consumed
an average of 291,253 gpd (down 9,999 gpd or 40 taps
from last month)
-
The
difference is "Backwash Water" ...(13.2%). We purchased
252,200 gals.
of water from MSM this month.
-
48.3% of this
water came from wells
-
2.5% of this water
came from Mt. St. Mary's
-
49.2% of this
water came from Rainbow Lake
Wastewater:
-
Staff is
continuing to operate the overland flow treatment
system
-
We received
about 7.7 inches of precipitation this month (the
average is 4.3 inches)
-
Wastewater
Treatment:
-
We treated
an average of 559,000 gpd (consumed 291,253 gpd)
which means that 47.9% of the wastewater treated this
month was "wild water".
-
We
experienced no spill of untreated sewerage
during the month of August
-
We exceeded the plant's design capacity
during the month of September
-
9/06
1,957,000 gal.
9/12 933,000
gal. 9/26 801,000 gal.
-
9/27
2,159,000
9/28 1,534,000 gal
Trash:
Parks:
-
Staff made all
standard checks and emptied trash cans
-
Staff installed additional receptacles in
the bandstand
-
Staff
performed some additional painting of the bandstand
-
Staff
replaced the wooden seats on the picnic table in Silo
Hill Park
-
Staff
worked on removing graffiti off of the Community Park
restrooms
-
Staff
performed standard mowing and trimming
Meetings
Attended:
-
09/03 Meeting
with MSM on water contract ext.
-
09/04 LEPC -
Emergency Planning meeting
-
09/09 Meeting
property owner related to possible mixed use
development
-
09/10 CASS /
NCTRAK transportation meeting
-
09/18 BOCC /
Municipal meeting
-
09/24
Meeting with HR consultant
-
09/25 LEPC
- Emergency Planning meeting
-
09/26
Planning meeting with the Mayor
-
09/26
Meeting with inspector and citizen related to code
violations and fines
-
09/29
Meeting with Town attorney related to proposed EEIP
contract