Town Manager's Report
January 2014
Prepared by David Haller
Streets:
Staff took down Christmas decorations
Staff repaired a number of street lights
Staff plowed and salted a number of streets
Staff replaced the street light control eye on Silo Hill
Parkway
Water:
Rainbow Lake is at the spillway level
The roughing filters are being backwashed three times a day
and the DE filters are being done twice a week.
Our wells are down an average of 11.0’ from their May 2011
levels.
Water production and consumption
o
We produced and purchased an average of 347,896 GPD. We
consumed an average of 312,254 GPD.
The
difference is "Backwash” Water ... (10.2%). We purchased
618,530 gallons of
water from MSM this month.
o
47.5% of this water came from wells.
o
5.7% of this water came from Mt. St. Mary's.
o
46.8% of this water came from Rainbow Lake.
Wastewater:
The overland flow treatment system is shut down for the
season.
We received about 2.9” of precipitation this month (the
average is 3.7”).
o
We have a precipitation SURPLUS of 4.8" over the last
six months. The average precipitation for the period from
August 1 thru January 31 is 22.1". We have received 26.9"
for that period.
Wastewater Treatment:
o
We treated an average of 545,000 GPD (consumed 312,254 GPD)
which means that 42.7% of the wastewater treated this month
was "wild water".
o
WE had no spills of untreated sewerage in January.
o
We exceeded the plant’s design capacity on three days in the
month of January.
01/06 1,092,000 GPD 01/11
1,143,000 GPD
01/12 889,000 GPD
Trash:
Trash pickup will remain
Mondays for the remainder of the month of February.
Parks:
Staff has performed standard mowing and trimming in all
parks.
Playground Specialist installed 68 cubic yards of wood
carpet mulch around the playground equipment in Community
Park
I Recently Attended the
Following Meetings:
01/06 Met with the Mayor to review the meeting agenda
01/06 Met with a developer to discuss a possible project
01/17 Met with a developer to discuss two possible projects
01/21 Met with solar project contractor
01/22 Met with the Mayor to review the meeting agenda
01/24 Met with staff and DNR to discuss some possible storm
water management projects
01/24 Met with the solar project contractor
01/30 Met with a developer to discuss a possible project
------------------------------------------------------------------------------------
PARKING ENFORCEMENT REPORT
Date: January 2014
Overtime Parking: 76
Restricted Parking Zone: 3
Parked in Crosswalk:
Parked on Sidewalk:
Parked Blocking Road:
Parked by Fire Hydrant:
Parked on Highway:
Failure to Park between
Lines:
Other Violation:
Left Side Parking: 1
Meter Money: $1,318.54
Parking Permits:
Meter Bag Rental: $6.00
Parking Ticket Money:
$300.00
Funerals:
Total: $1,624.54