Town Manager's Report

January 2014

Prepared by David Haller  

Streets:

Staff took down Christmas decorations

Staff repaired a number of street lights

Staff plowed and salted a number of streets

Staff replaced the street light control eye on Silo Hill Parkway

Water:

Rainbow Lake is at the spillway level

The roughing filters are being backwashed three times a day and the DE filters are being done twice a week. 

Our wells are down an average of 11.0’ from their May 2011 levels.  

Water production and consumption   

o We produced and purchased an average of 347,896 GPD.  We consumed an average of 312,254 GPD.  

 The difference is "Backwash” Water ... (10.2%). We purchased 618,530 gallons of
 water from MSM this month.
 

o 47.5% of this water came from wells.   

o   5.7% of this water came from Mt. St. Mary's. 

o 46.8% of this water came from Rainbow Lake.  

 Wastewater:

The overland flow treatment system is shut down for the season. 

We received about 2.9” of precipitation this month (the average is 3.7”).    

o We have a precipitation SURPLUS of 4.8" over the last six months.  The average precipitation for the period from August 1 thru January 31 is 22.1".  We have received 26.9" for that period. 

Wastewater Treatment:    

o We treated an average of 545,000 GPD (consumed 312,254 GPD) which means that 42.7% of the wastewater treated this month was "wild water".

o WE had no spills of untreated sewerage in January.

o We exceeded the plant’s design capacity on three days in the month of January.  

01/06 1,092,000 GPD  01/11 1,143,000 GPD

01/12     889,000 GPD   

Trash:  

Trash pickup will remain Mondays for the remainder of the month of February.

Parks:

Staff has performed standard mowing and trimming in all parks.

Playground Specialist installed 68 cubic yards of wood carpet mulch around the playground equipment in Community Park

I Recently Attended the Following Meetings:  

01/06 Met with the Mayor to review the meeting agenda

01/06 Met with a developer to discuss a possible project

01/17 Met with a developer to discuss two possible projects

01/21 Met with solar project contractor

01/22 Met with the Mayor to review the meeting agenda

01/24 Met with staff and DNR to discuss some possible storm water management projects

01/24 Met with the solar project contractor

01/30 Met with a developer to discuss a possible project

------------------------------------------------------------------------------------ 

PARKING ENFORCEMENT REPORT

 

Date:  January 2014

Overtime Parking: 76

Restricted Parking Zone: 3

Parked in Crosswalk:

Parked on Sidewalk: 

Parked Blocking Road: 

Parked by Fire Hydrant:

Parked on Highway:

Failure to Park between Lines:

Other Violation:

Left Side Parking: 1

Meter Money:  $1,318.54

Parking Permits: 

Meter Bag Rental: $6.00

Parking Ticket Money:  $300.00

Funerals: 

 

Total:  $1,624.54

 

 